Planned Roadworks

The Isle of Wight Council (Combley Road, Havenstreet, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 0800 hours until 1600 hours for one day on Wednesday 02 February 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Combley Road between its junctions with Gravel Pit Lane and Newport Bridleway 17. The alternative route will be sign posted locally. The closure is required for safety during CCTV drainage surveys.

Notice is hereby given that the Isle of Wight Council in not less than seven days from the appearance of this Notice, under Section 14 (1) (a) of the Road Traffic Regulation Act 1984, proposes to make the following Orders: –

Island Roads on behalf of the Isle of Wight Council give notice that between Friday 04 February 2022 and Friday 29 April 2022 the following roads will be closed for days, nights, or both day and night for a period of approximately one to 15 days, or when the works have been completed, to enable carriageway maintenance works to be undertaken. No vehicle or person may use or cause any animal to use the following roads; and that no vehicle is permitted to wait on the following roads or within 50 metres on any adjoining side road where indicated by traffic signs. These works may include carriageway and footway reconstruction and resurfacing works. In some cases, it may be necessary to close these sections of roads on more than one occasion within this timeframe. Exact dates, durations and access information will be communicated to affected businesses and residents via letter and on street advanced warning signs before the scheme commences. Adverse weather will have an impact on this programme:

The Isle of Wight Council (Various Streets, Isle of Wight) (Temporary Road Closure and Parking Restrictions) Order No 1 2022 –

Church Road, Havenstreet for its entire length; ; Deacons Lane, Ryde for its entire length;

Planning Decisions

21/02383/FULApplication No:
Isle Of Wight Railway Co Ltd The Railway Station Havenstreet Main
Road Havenstreet Ryde Isle Of Wight PO33 4DS
Location:
Proposed bicycle rack (6 hoops to secure 12 bicycles)Proposal:
Havenstreet And AsheyParish: Newchurch Havenstreet And
Ashey
Granted

Roadworks

The Isle of Wight Council (Gatehouse Road, Ryde, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 0800 hours from Monday 31 January 2022 until 2200 hours on Tuesday 01 February 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Gatehouse Road between its junctions with Deacons Lane and Ryde Bridleway 21. The alternative route will be sign posted locally. The closure is required for safety during utility works.

The Isle of Wight Council (Combley Road, Havenstreet, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 1 2022

Island Roads on behalf of The Isle of Wight Council give notice that from 0800 hours until 1600 hours for one day on Wednesday 02 February 2022, or when the works has been completed, no person shall cause any vehicle to proceed along Combley Road between its junctions with Gravel Pit Lane and Newport Bridleway 17. The alternative route will be sign posted locally. The closure is required for safety during CCTV drainage surveys

Agenda 20.1.2022

Agenda 20.1.2022

Minutes 4.11.2021

Minutes Thursday 4 November 2021Minutes Thursday 4 November 2021 (draft)

Planning Application

Application No: 21/02514/FUL
Parish(es): Havenstreet And Ashey Ward(s): Newchurch Havenstreet And Ashey
Location: Ponda Rosa
Ashey Road
Ryde
Isle Of Wight
PO33 4BB
Proposal: Demolition of former restaurant building and ancillary function room; construction of five
dwellings and two self-contained holiday homes, parking and landscaping

Planning Decision 11.1.2022

Planning Decision 11.1.2022

Smallbrook Junction Update 13.1.2022

Smallbrook Junction Update

Roadworks 13.1.2022

Roadworks 13.1.2022